![TRACO POWER TSP-BFM24 Operating Instructions Manual Download Page 6](http://html1.mh-extra.com/html/traco-power/tsp-bfm24/tsp-bfm24_operating-instructions-manual_1147361006.webp)
Tel: +41 43 311 4511
Fax: +41 43 311 4545
[email protected]
www.tracopower.com
Date: 24 May 2005
Issue: 1.2
Page
Seite
6
Jenatschstrasse 1
CH-8002 Zürich
Block diagram TSP-BFM24
TSP-BFM24 – Buffer Time vs. Load Power
TSP-BFM24 - Buffer Time vs Load Power (typical values)
0
50
100
150
200
250
300
350
400
450
500
550
600
0
0.25 0.5 0.75
1
1.25 1.5 1.75
2
2.25 2.5 2.75
3
3.25 3.5 3.75
4
4.25
Time [s]
Load Power [W]
Fig.: 2.1
Fig. 1.1
J2.2
J2.1
J1.1
J1.2
J1.3
J1.4
J2.4
J2.3
J2.6
J2.5