Trace2O HMUV1825 Manual Download Page 14

14  

www.trace2o.com

 

Trace2o UV Digester HMUV1825P 

Instruction Manual v3.0

 

 

 

9. POWER PACK 

 
IMPORTANT INFORMATION FOR YOUR SAFETY 

 

 
DO NOT SHORT CIRCUIT OR TAMPER WITH THIS UNIT. ALWAYS OBSERVE 
CORRECT POLARITY AND SYSTEM VOLTAGE WHEN CONNECTING. 

 

 
Failure to do so may lead to a HAZARDOUS situation, damage the pack or 
equipment and may invalidate the warranty. Remove personal items such as 
rings, bracelets and watches when working with batteries. 

 
WARNING 

 

 
Before initial use, the 230V AC portable power pack 

must 

be put on charge 

overnight (16Hrs). Failure to do so may reduce the life of the product and 
invalidate the warranty. 

 
DESCRIPTION 

 

 
This 100W Portable Power Unit provides a versatile and complete power 
solution that is safe and easy to use. The power unit is fitted with one, high 
performance, 12V 12Ah lead-acid battery. It gives one output available on the 
outside of the unit, that is capable of powering loads up to 100W overall 
(depending on temperature of operation). Also incorporated is a 'low voltage 
disconnect' system, which prevents damage to the batteries due to over 
discharge. 

 
OPERATION 

 

 
BEFORE OPERATING THIS EQUIPMENT READ ALL OPERATING 
INSTRUCTIONS THOROUGHLY 

 

 
FOR 230V AC OUTPUT:  

 
1. Ensure the unit is turned ‘OFF’  
2. Connect an AC output lead to the ‘230V AC OUTPUT’ output  
3. Connect the lead assembly to the equipment  
4. Press the ‘ON’ button of the unit (internally)  
5. The ‘SYSTEM POWER’ LED should illuminate  
 

In this state, the battery voltage is continually monitored. When the battery 
voltage falls below approximately 10.6V, the 230V AC output will turn off to 
protect the batteries from becoming over discharged 

 
 
 
 

Summary of Contents for HMUV1825

Page 1: ...UV DIGESTER HMUV1825P Portable Ultraviolet Heavy Metal Sample Digester...

Page 2: ...er HMUV1825P Instruction Manual v3 0 CONTENTS 1 KIT CONTENT 3 2 INTRODUCTION 4 3 SAFETY INFORMATION 5 4 SETTING UP THE UNIT 6 5 PROGRAMMING THE DIGESTION TIME 7 6 CARE AND MAINTENANCE 8 7 WARRANTY 12...

Page 3: ...trace2o com 3 Trace2o UV Digester HMUV1825P Instruction Manual v3 0 1 KIT CONTENT Lamp viewing window Timer Lamp connector On Off switch Mains inlet socket Recirculating pump Sample tubes Beaker hold...

Page 4: ...tion of water samples with a high organic content The process of digestion will break down complex organic compounds into simpler organic compounds and release metal ions bound within the organic mate...

Page 5: ...e lamp while the unit is switched on it will switch off automatically The unit contains no user serviceable parts and as such no attempt should be made to open it Any attempt to do so will invalidate...

Page 6: ...power pack to the socket on the right hand side of the unit Open the lid of the unit and locate the Power switch Depress the switch to the on position The display on the timer will turn on Fill the su...

Page 7: ...urs Pressing the programme button again will set the time If the digits are flashing the timer will not operate Once the time is set press the start button The pump will turn on and the lamp will illu...

Page 8: ...sed water and the outlet tube into a second beaker Run the instrument for 5 minutes to flush the tubes Once a week it is recommended to run a 0 1M solution of hydrochloric acid through the pipes It is...

Page 9: ...very little maintenance but periodic replacement of the pump tubing and Lamp may be necessary UV Lamp replacement Carefully unscrew the locking ring from the top of the lamp connector Slowly remove th...

Page 10: ...into the connector slowly and with no force If held vertical and lowered carefully the lamp should slide easily back into position When refitting the top of the connector align the arrow on the top of...

Page 11: ...move the pump cover by inserting a flat screwdriver blade into one of the slots and twisting Remove the two sample tubes from the two white inline connectors Pull the short tube out of the pump housin...

Page 12: ...0 7 WARRANTY The HMUV1825 digester is guaranteed for one year from the date of receipt against manufacturing defects on all non consumable parts This warranty excludes the lamp and the pump tubing Da...

Page 13: ...nlet UV Lamp 185nm 254nm Wavelength 4 Watt Sample volume 50 250 ml Sample type Potable surface and ground water Intended use Digestion of water samples for subsequent detection of Heavy metal content...

Page 14: ...on that is safe and easy to use The power unit is fitted with one high performance 12V 12Ah lead acid battery It gives one output available on the outside of the unit that is capable of powering loads...

Page 15: ...M POWER LED should illuminate 3 Press the Push to Test button 4 The LEDs will illuminate to indicate the approximate state of charge of the battery STORAGE To optimize performance and service life it...

Page 16: ...button 1 visual indicator MECHANICAL Housing Protection Dimensions Weight Ruggedised case Rated IP67 waterproof when closed 300 L x 255 W x 196 H mm 3 Kgs STANDARD CHARGER Built in AC Mains Input Mai...

Page 17: ...www trace2o com 17 Trace2o UV Digester HMUV1825P Instruction Manual v3 0 NOTES...

Page 18: ...Trace2o UV Digester HMUV1825P Instruction Manual v3 0 Technology Centre Wagtech Court Station Road Thatcham Berkshire RG19 4HZ United Kingdom T 44 0 1635 866772 Fax 44 0 1635 873509 E sales trace2o co...

Reviews: