TPC H6005 User Manual Download Page 2

TPC  

Installation instruction  

 

1.

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

2.

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

3.

 

 

 
 
 
 
 
 
 

Place the H6000 in a location 
where you have an air line. 
Generally this location will be 
located near your sterilization 
area. You will also need an 
electrical outlet, Connect your air 
line and electrical. 

Fill lubrication reservoir with the 
supplied lubrication fluid. Make 
sure not to over fill the reservoir 
or spillage will occur. After 
filling, be sure to tighten the oil 
reservoir cap.  

Place absorbent pads into place. 
These pads will absorb any 
excess lubrication that is 
released in the chamber. The 
pads need to be replaced every 
tank cycle. 

 

Reviews: