I
NSTALLING
THE
S
WITCH
3-4
Mounting
This switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following
factors:
•
Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range 0 °C to 40 °C.
•
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
•
Circuit Overloading: Be sure that the supply circuit to the rack
assembly is not overloaded.
•
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.
Summary of Contents for TL-SL5428
Page 1: ...Installation Guide TL SL5428 24 Port 10 100 4 Port Gigabit Managed Switch Rev 1 0 1...
Page 5: ...TABLE OF CONTENTS iii Standards C 3 Compliances C 3 Glossary Index...
Page 6: ...TABLE OF CONTENTS iv...
Page 8: ...vi...
Page 10: ...FIGURES viii...
Page 18: ...ABOUT THE TL SL5428 1 8...
Page 34: ...INSTALLING THE SWITCH 3 10...
Page 60: ...Glossary 6...
Page 64: ...TP LINK TECHNOLOGIES CO LTD http www tp link com 7106503136...