AC power line or DC power line according to user requirement 

 

RJ-45-to-DB-9 console cable 

3.2  Pre-installation Preparation 

Verify the following working environment and installation requirements 

1.  Power Supply Requirement: 

- DC power supply: 

–48V DC, the allowed range:-36VDC~ -72 VDC 

- AC power supply: 110/220V AC, the allowed range: 90 ~ 264VAC 

2.  The equipment should be equipped in the dry, cool place, at least have 10 centimeters at both 

sides for the ventilation space. 

3.  Avoid  the  direct  light,  far  away  from  the  heat  source  or  the  place  with  the  stronger 

electromagnetic interference 

4.  If  want  to  install  OLT  inside  the  rack,  ensure  that  have  the  necessary  mounting  screws  and 

nuts and necessary tools. 

5.  Check the required cable and connectors for installation 

6.  In the system management, need connect the following equipment with OLT: 

- A management platform, such as PC 

- RJ45/DB9 RS232 Console line 

3.3  OLT Installation 

OLT can be put in the bigger horizontal surface or within the standard EIA 19" rack. 

3.3.1 Plane stack installation 

Step I: Pre-Installation Validation 

 

Ensure the worktable is strong enough to support the weight of the device and cables. 

 

Ensure  no  obstacles  on  the  worktable  and  the  surroundings  affecting  the  installation  of  the 

device exist. 

 

Prepare  the  OLT  device  to  be  installed  and  move  the  device  to  the  place  where  is  near  the 

work table and facilitates the handling. 

Step II: Lift the OLT device and slowly move to the front of the worktable. 

Step III: Move the OLT device to the location slightly higher than the worktable and then place the 
OLT device to the specified location on the worktable. 

3.3.2 Rack Installation 

OLT equipment can be installed inside 19’’ rack which is compliance with ETSI standard. OLT rack 
diagram as shown in below. 

Summary of Contents for P1200-08

Page 1: ...Installation User Guide GPON OLT P1200 08 Version V1 0...

Page 2: ...s are trademarks or registered trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation tra...

Page 3: ...n 5 3 3 1 Plane stack installation 5 3 3 2 Rack Installation 5 3 4 Port and Connection 6 3 4 1 Uplink Port 6 3 4 2 PON Port Connection 7 3 4 3 Ground Cable Connection 8 3 4 4 Management Port Connectio...

Page 4: ...he network applications Figure 1 1 P1200 08 in GPON system 1 2 Functional Features Comply with ITU T G 984 G 988 standards and China s Telecom industry GPON standards Support OMCI remote management of...

Page 5: ...ace The P1200 08 1U high Pizza Box can be mounted into the standard 19 rack Demission of machine frame 440mm L 391mm W 44mm H As shown below Figure 1 2 Front View of P1200 08 See the following table I...

Page 6: ...link with the OLT port n GE n n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Flash There is the communication data at the uplink port n Green Always ON The uplink port n is connected OFF The uplink port n i...

Page 7: ...mperature is 0 C 40 C To ensure that equipment works in the normal temperature environment 25 C or so should try to make the equipment away from the main heat source such as power supply etc if the en...

Page 8: ...ent need connect the following equipment with OLT A management platform such as PC RJ45 DB9 RS232 Console line 3 3 OLT Installation OLT can be put in the bigger horizontal surface or within the standa...

Page 9: ...the cabinet Step IV Use screws to fix the suspension loops of the cabinet to the square holes of the 19 inch cabinet column and to fix the OLT device to the cabinet 3 4 Port and Connection The chapte...

Page 10: ...k connection Cable with RJ45 connectors at both sides Cable with LC connector at both sides Decide the port type of OLT according to the port type of the uplink device Switch or Route 3 4 1 3 Method o...

Page 11: ...t access marked as MGMT RJ45 type port Console access is really only required when initially configuring a device or if remote access fails Console access requires Console cable RJ 45 to DB 9 console...

Page 12: ...y unit Additionally to ensure true AC line input redundancy for the OLT you should connect each AC power cable to a different AC power source You can also connect an uninterruptible power supply UPS b...

Page 13: ...DC input power cable 3 5 OLT working status checkout 3 5 1 Check out power supply Before you connect the power supply double check the power supply if it is accord with the power supply requirements I...

Page 14: ...sword admin 5 Appendix OLT Specification Item Specification Chassis Rack 1U 19 inch standard box Slots 1 10 Gigabit uplink card slot 2 power module slot Uplink Port Copper 8 10 100 1000M auto negotiab...

Page 15: ...tate monitoring configuration management equipment log equipment upgrades equipment management user management Layer 2 switch configuration such as Vlan Trunk RSTP IGMP QOS etc PON management function...

Reviews: