3.4.5.2  Connecting the DC Input Power Cable 

1.  Identify the parts that you will use to assemble the DC input power cable 

The following DC connection cable is required to assemble one or more DC power input cables. 
These cables connect the -48V DC input source(s) to the power supply units. 

2.  Turn off power from the DC power source through the circuit breakers. 

Caution - Do not proceed with these instructions until you have turned off the power from the DC 
power source through the circuit breakers. 

3.  Get a DC input plug from the ship kit. 

4.  Locate the four wires coming from the DC power source that will be used in the connection to 
your unit: 

-48V: negative terminal 

-48V: Return (positive terminal)   

-48V: Earth ground 

5.  Unscrew the screws, the cable wire fixed on the DC screw.   

6.  Repeat Step 5 for the other two wires to complete the assembly of the DC input power cable. 

3.5  OLT working status checkout 

3.5.1 Check out power supply 

Before you connect the power supply, double check the power supply if it is accord with the power 
supply requirements, If each module and card are installed correctly, If the equipment is in reliable 
grounding or not. After checking everything is OK, you can turn on the power supply sources. 

3.5.2 

Check out OLT’s working status 

Please check if the OLT’s working status from following aspects:   

 

Check the power LED. The power LED will be on. 

 

The SYS LED will flash per second. 

 

If the uplink equipment is connected to the uplink port, the relevant connection LED is on. 

3.5.3 Network Management Checkout 

Local Command Line Interface Management: 

Use  the  RJ45/DB9  Serial  Port  cable  (in  package)  to  link  management  PC  with  P1200-08 
CONSOLE  or  MGMT  port.  Management  computer  can  access  to  OLT  equipment  from  Super 
terminal interface of the PC for configuration. 

Please refer to relevant CLI user manual. 

4 Default Configuration 

4.1  Network Parameter Configuration 

Management Port 

Summary of Contents for P1200-08

Page 1: ...Installation User Guide GPON OLT P1200 08 Version V1 0...

Page 2: ...s are trademarks or registered trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation tra...

Page 3: ...n 5 3 3 1 Plane stack installation 5 3 3 2 Rack Installation 5 3 4 Port and Connection 6 3 4 1 Uplink Port 6 3 4 2 PON Port Connection 7 3 4 3 Ground Cable Connection 8 3 4 4 Management Port Connectio...

Page 4: ...he network applications Figure 1 1 P1200 08 in GPON system 1 2 Functional Features Comply with ITU T G 984 G 988 standards and China s Telecom industry GPON standards Support OMCI remote management of...

Page 5: ...ace The P1200 08 1U high Pizza Box can be mounted into the standard 19 rack Demission of machine frame 440mm L 391mm W 44mm H As shown below Figure 1 2 Front View of P1200 08 See the following table I...

Page 6: ...link with the OLT port n GE n n 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Flash There is the communication data at the uplink port n Green Always ON The uplink port n is connected OFF The uplink port n i...

Page 7: ...mperature is 0 C 40 C To ensure that equipment works in the normal temperature environment 25 C or so should try to make the equipment away from the main heat source such as power supply etc if the en...

Page 8: ...ent need connect the following equipment with OLT A management platform such as PC RJ45 DB9 RS232 Console line 3 3 OLT Installation OLT can be put in the bigger horizontal surface or within the standa...

Page 9: ...the cabinet Step IV Use screws to fix the suspension loops of the cabinet to the square holes of the 19 inch cabinet column and to fix the OLT device to the cabinet 3 4 Port and Connection The chapte...

Page 10: ...k connection Cable with RJ45 connectors at both sides Cable with LC connector at both sides Decide the port type of OLT according to the port type of the uplink device Switch or Route 3 4 1 3 Method o...

Page 11: ...t access marked as MGMT RJ45 type port Console access is really only required when initially configuring a device or if remote access fails Console access requires Console cable RJ 45 to DB 9 console...

Page 12: ...y unit Additionally to ensure true AC line input redundancy for the OLT you should connect each AC power cable to a different AC power source You can also connect an uninterruptible power supply UPS b...

Page 13: ...DC input power cable 3 5 OLT working status checkout 3 5 1 Check out power supply Before you connect the power supply double check the power supply if it is accord with the power supply requirements I...

Page 14: ...sword admin 5 Appendix OLT Specification Item Specification Chassis Rack 1U 19 inch standard box Slots 1 10 Gigabit uplink card slot 2 power module slot Uplink Port Copper 8 10 100 1000M auto negotiab...

Page 15: ...tate monitoring configuration management equipment log equipment upgrades equipment management user management Layer 2 switch configuration such as Vlan Trunk RSTP IGMP QOS etc PON management function...

Reviews: