PREP
ARAT
IO
N
25
CHECKUPS BEFORE STARTING OPERATION
Before starting the machine, carry out checkups as indicated below.
CAUTION
Turn the main switch OFF before checking the machine prior to starting the operation.
If you check the machine without turning the main switch OFF, you could sustain injury.
Check Point
Description
Action
Covers
Check for disengagement.
Install if disengaged.
Thread
Check for disengagement.
Set if disengaged.
Check for breakage.
Set if broken.
Needle
Check for bend.
Replace if bent.
Check for breakage.
Replace if broken.
Rotary hook rail
Check if appropriate amount of
oil applied.
Lubricate as required.
FD07
!
Summary of Contents for Expert EPS9000
Page 2: ......