1. SAFETY RULES
This generator is movable on the ground. Please read this manual carefully before
operation. To operate the generator after fully understanding the contents of working,
check and maintenance.
The explosive motor is adopted in the generator, so the parts of muffler and water case are very
hot. Failure to operate could lead to burn. Please note the warning stickers on the generator.
Fuel and lube oil are inflammable which close to the fire, this may touch off
fire hazard or explosion. The extinguisher and first-aid kit should be set in the working field.
Use SAE 15W-40 lubrication oil, or the same grade of CD or CF oil . Change the oil
after the first 50 hours operation. Afterwards, change it each 200 hours.
Don't connect the generator to other power supplies. Such as main-supply
of power company. In some special cases, please connect the stand-by power to the electrical
system by professional electrician who must know the difference between public supply and
generator circuit.
For information about the engine operation and maintenance, please see
our engine's manual.
Laymen especially the children cannot realize the danger, they should keep away from the
generator.
Please wear suitable clothes and safety protective cover all.
The key of door lock and electric door accessories for meter door and maintenance door of silent
unit should be well kept by operators. Please lock the doors of generator tightly to prevent
somebody to operate (the children cannot realize the danger).
2. PREPARATORY STEPS FOR OPERATION
2. Environmental Requirements
2-1 Outdoors use:
1) Install Generator in a dry and dustless place.
2) Avoid the direct sunshine, place Generator in shade.
3) Keep Generator on a lever ground so that the unit will not move by itself. For safely, fix the
unit on the ground by pegging.
1-2 Indoor use:
1) Use in well-ventilated areas, or vent exhaust outside and away from a building air intakes. A
large volume of air is required for the operation.
2) Keep the air inlet/outlet and the exhaust gas outlet 1.5m away from any obstacle.
3) Use under 40 degrees temperature. Install Generator on a lever surface.
2.1. Preparation for the engine
2.1.1 Initial start check
Summary of Contents for TDWG12000CXE-N
Page 1: ...1 ...
Page 13: ...13 7 THE FUNCTIONS OF THE DIGITAL PANEL OPERATION PANEL ...
Page 17: ...17 9 MALFUNCTION AND COUNTERMEASURES 1 Maintenance Schedule ...
Page 20: ...20 2 Judge and eliminate trouble ...
Page 21: ...21 ...
Page 22: ...22 Controller Troubleshooting ...
Page 23: ...23 11 ELECTRICAL DIAGRAM 1 Single Phase TDWG12000CXE N TDWG12000SGE N ...
Page 24: ...24 2 Three Phase TDWG12000CXE3 N TDWG12000CXE3D N TDWG12000SGE3 N TDWG12000SGE3D N ...
Page 44: ...44 11 DIAGRAMA ELÉTRICO 11 1 Monofásico TDWG12000CXE N TDWG12000SGE N ...
Page 45: ...45 11 2 Trifásico TDWG12000CXE3 N TDWG12000CXE3D N TDWG12000SGE3 N TDWG12000SGE3D N ...
Page 56: ...56 PANEL DE OPERACIONES ...
Page 59: ...59 9 M ALFUNCIONES Y COMO CONTRARESTARLAS ...
Page 60: ...60 ...
Page 62: ...62 2 Chequee y elimine problemas ...
Page 63: ...63 ...
Page 64: ...64 Problemas con el controlador 11 DIAGRAMA DE CABLEADO ELECTRICO 11 1 Monofásico ...
Page 65: ...65 TDWG12000CXE N TDWG12000SGE N 11 2 Trifásico ...
Page 72: ...72 ...
Page 73: ...73 TY_TDWG12000CX SG_MA_R00 ...
Page 74: ...74 ...