PILOT SUPPLY
TUBE
MAIN GAS SUPPLY
TUBE
Fig. # 4
5.
Attach the pilot and gas supply tubes to
the bulk head fi tting and tighten.
(Fig. # 3b) Ensure the connections are
gas tight. Conceal the spark and
sensor wires below the supply tubes.
A panel set must now be installed. See
Installation and Operating Instructions
manual for details.
6. Position the slots of the grate securing
brackets over the holes in the fl oor shield
and secure with the two screws
(Fig. # 4).
Fig. # 3b
TC36.NG02CN 210411-16
4
Summary of Contents for TC36.NG02CN
Page 7: ...Fig 8 Fig 9 4 3 TC36 NG02CN 210411 16 7 ...
Page 8: ...Fig 10 Fig 11 5 6 TC36 NG02CN 210411 16 8 ...
Page 13: ...TC36 NG02CN 210411 16 13 ...
Page 14: ...TC36 NG02CN 210411 16 14 ...
Page 15: ...TC36 NG02CN 210411 16 15 ...