background image

- 2 - 

tousek

  /  E_SWING-X_42001005  /  06. 02. 2012

 

Important warning and safety notes for installation and operation

•   These installation- and operating instructions form an integral part of the product “gate operator”. They have been specifically written for professional installers 

trained and skilled in the trade and should be carefully read in their full length before carrying out the installation. They describe the proper installation and 

operation of the sliding gate operator only, not of the overall device “automatic gate”. After the installation this manual has to be handed over to the user.

•   Installation, connection, adjustments, putting into operation, and servicing may only be carried out by trained professionals in full accordance 

with these installation- and operating instructions.

•   The EU Machine Directive, laws and rules concerning the prevention of accidents, and laws and standards which are in force in the EU and in the individual 

countries have to be strictly followed.

•   The TOUSEK Ges.m.b.H. cannot be held liable for any claims resulting from disregards of the laws and standards in force during the installation and operation.

•   The product may only be used in accordance with its original purpose, for which it has been exclusively designed, and which is described in these installation 

and operating instructions. The TOUSEK Ges.m.b.H. rejects any liability if the product is used in any way not fully conforming to its original purpose as 

stated herein.

•   The product is not suitable for installation in explosion-hazardous areas. The existance of inflammable gas and steam is of great danger !

•   The packaging materials (cardboard, plastic, EPS foam parts and filling material etc.) have to be properly disposed of in accordance with the applying 

recycling- and environmental procection laws. They may be hazardous to children and therefore have to be stored out of children´s reach.

•   Before beginning with the installation the installer has to make sure that all mechanical components of the gate facility, like carrier profile/rail, gate frame and 

panels, guiding elements etc. are sufficiently supportive and resistant for the purpose of gate automation. Check also whether  the product has transport 

damages

.

•   All electrical installations have to be made in full conformity with the applying rules and laws (e.g. using a fault current circuit breaker, proper grounding etc.).

•   An all-pole disconnecting main switch with a contact opening-gap of minimum 3 mm has to be foreseen.

•   When installing the safety device (photocells, safety edges, emergency-stops etc.) please comply with the valid direcitves/standards, the criteria of practical 

rules of conduct, the installation environment, the operating logic of the system and the effected force of the motorised gate. .

•   The safety devices must secure possible bruise, shear and general danger areas of the motorised gate.

•   After installation the proper function of the gate facility and the safety devices has to be checked!

•   Place warning signs and notes of the valid regulations to indicate danger areas .

•   With each installation the identification data of the motorised gate has to be placed in a visible place. 

•   The label for the Handauslöser has to be placed next to its operating element.

•   The electric motor heats up during operation. Therefore the device should only be touched after it has cooled off.

•   Please make sure that no other persons are on site of the motorised gate area, especially in when operating the facility in hold to run mode

 

(switch with 

OFF-pre adjustment) 

The pre-adjusted OFF-button/switch has to be placed in sight of the actuated gate but away from moving parts.

 

This switch/button 

(except key-switch) has to be mounted in min. 1,5m height and non-accessible to the public.

•   Children have to be instructed, that the gate facility as well as the belonging parts may not be used improperly, e.g. for playing. Furthermore handheld 

transmitters have to be kept in safe places and other impulse emitters as buttons and switches have to be installed out of children‘s reach.

•   Only original spare- and replacement parts may be used for repair of the product.

•   The TOUSEK Ges.m.b.H. rejects any liability for claims resulting from usage of the product in combination with components or devices which do not fully 

conform to the applying safety laws and rules.

•   The installer has to inform the user about all aspects of the automatic operation of the complete gate facility, as well as about emergency operation. The 

installer further has to supply to the user all instructions relating to the safe operation of the gate facility. The installation and operating instructions also 

have to be handed over to the user. 

•   The user has to be informed that he has to turn off the main power switch in case of malfunction of the product and that he can use the facility again after 

repair and adjustment works have been completed. 

•  Please notice that the warranty will not be applicable if the label with the engine number has been removed or 

damaged.

EU - Manufacturer´s Declaration according to Machine Directive 2006/42/EC:

The company TOUSEK Ges.m.b.H., based in Zetschegasse 1, A-1230 Vienna/Austria, hereby declares that the  

“swing gate operator SWING X”

 is made available only for the purpose of being built into a machine or being joined 

with other machines or machine components, and that it may not be put into operation until a declaration of conformity 

according to the Directive 2006/42/EC has been issued for the whole machine.

The following directives and standards have been applied:

- Low Voltage Directive 2006/95/EC, incl. changes

- Electromagnetic Compatibility Directive 2004/108/EC, incl. changes

January 2012

 

Maintenance

• 

Disconnect the power supply during mounting, maintenance and repair works. 

•  Maintenance works may only be carried out by qualified personnel.

•  Check the proper force adjustment once a month.

•  Check the proper function of the emergency release mechanism periodically.

•  Check if all mounting screws are securely fastened periodically.

•  Remove dirt from the operator periodically.

•  Maintenance and servicing of the complete gate facility has to be carried out according to the gate builder’s/

installer’s instructions.

This manual is the sole property of the TOUSEK Ges.m.b.H. and may not be made available to competitors. All rights reserved. No part of it may be reproduced without our prior 

written permission. We will not accept liability for any claims resulting from misprints or errors. This edition of the manual replaces all earlier publications of the same.

Summary of Contents for Swing-X

Page 1: ...Installation and operating instructions Swing gate operator SWING X ...

Page 2: ...for the Handauslöser has to be placed next to its operating element The electric motor heats up during operation Therefore the device should only be touched after it has cooled off Please make sure that no other persons are on site of the motorised gate area especially in when operating the facility in hold to run mode switch with OFF pre adjustment The pre adjusted OFF button switch has to be pla...

Page 3: ...uching an obstacle the operator stops and reverses automatically This guarantees a high degree of safety the operator closes the gate reliably The emergency release which is important in case of power failure is lockable with a stan dard profile half cylinder It can therefore be replaced and integrated into an already existing house key system The cylinder and 3 keys are included as standard equip...

Page 4: ...hat can be used for gates below 200kg and with a wing width below 3m for adjustment of limit positions OPEN and CLOSED Gates with a weight above 200kg and more than 3m gate width can not be used with the internal limit stops please use external limit stops 4 for gate limit positions particularly in the closed position it is recommended to use always a floor limit stop 4 or Tousek piston rod With l...

Page 5: ...t centered inside to gate leaf A B C D INSIDE max 60mm A B C D INSIDE Mounting measures SWING X3 opening to the INSIDE SWING X3 1 standard stroke SWING X3 1LH long stroke Application standard standard for larger columns for larger opening angle A mm 145 190 180 250 160 B mm 145 190 160 200 C mm 860 990 990 990 D mm 110 130 130 130 max opening angle 100 110 100 120 max wing width 3m 3m 3m 3m Mounti...

Page 6: ... fully closed and that the vertical misalignment V 65mm between the two welding parts is kept to ensure a levelled mounting of the operator With lean or wooden gates the welding part should not be mounted directly on the gate Please use for that a flat steel bar support the front welding part 1 with a gusset plate 3 Mounting measures opening to the OUTSIDE SWING X3 1 standard stroke SWING X4 1 sta...

Page 7: ...ve the internal limit stop closed 5 after dismantling the hexagon head screw towards the part L on contact After that please tighten the hexagon head screw Now move the gate into OPEN limit position Now move the internal limit stop open 6 after dis mantling the hexagon head screw towards the partl L on contact After that please tighten the hexagon head screw again Lock the operator again 5 L 6 L R...

Page 8: ...unit please see manual for control unit Warning Before carrying out the electrical connections the power supply of the gate facility must be turned off The safety regulations for electric shock prevention have to be complied The device should only be connected by qualified personnel The device should not be used in an explosive environment An all pole disconnecting mains switch with a contact open...

Page 9: ...e have to be secured In this context please follow the EU Machine Directive accident prevention rules and laws as well as applying EU and national standards in force at the time of installation and operation of the gate facility The Tousek Ges m b H cannot be held responsible for any consequences resulting from disregard of applying standards and laws during installation or operation of the gate f...

Page 10: ...res in mm 1 front welding part installation on the gate supported by gusset plate 2 rear welding part installation on the gate column supported by gusset plate 5 internal limit stop for position CLOSED with gates opening to the inside 6 internal limit stop for position OPEN with gates opening to the inside L running part measures and technical modifications subject to change 5 Dimensioned sketch S...

Page 11: ...tousek E_SWING X_42001005 06 02 2012 11 ...

Page 12: ... Tousek GmbH Germany D 83395 Freilassing Traunsteiner Straße 12 Tel 49 86 54 77 66 0 Fax 49 86 54 5 71 96 info tousek de Tousek GmbH Switzerland CH 6275 Ballwil Bahnhofstraße 14 Tel 41 0 41 448 2965 Fax 41 0 41 448 2966 info tousek ch Tousek Sp z o o Poland PL 43 190 Mikołów k Katowic Gliwicka 67 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 130 00 Praha 3 J...

Reviews: