Installation Procedure
ENGLISH
4
Information below should be observed in order to properly install the shower.
7-7/8”
(200 mm)
15-3/4” (410 mm)
39” (1000 mm) from the floor
44” (1100 mm)
Location of
Showerhead
Location of
wall spout
Location of
Thermostatic
Mixing valve
Location of
Dual Volume
Control Valve
Location of
Single Volume
Control Valve
Location of
HandShower
Adapter
FLOOR
7-7/8”
(200 mm)
Showerhead
Wall Spout
1/2” pipe
Single Vol
Control
Valve
Dual Vol
Control
Valve
Hand Shower
Adapter
(TRIM is to be installed here.)
Thermostatic
Mixing Valve
Preparation
Plumbing Setup
HOT
COLD
Hand Shower Trim does not have direct water connections or volume control;
those items need to be purchased separately (See the Shower Setup Options)
Each item is
sold separately.
Refer to Handshower Adapter Installation manual
for detailed installtion procedure of the adapter.
Caution
MIN
Guard
cover
MAX
FINISHED
WALL
2-15/16” (75mm) MIN
3-9/16” (90mm) MAX
①
After confirming the rough-in of the adapter provided,
connect the adapter with the Single Volume Control
Valve (SOLD SEPARATELY).
Leave the guard covers on the valves
till the tile work is completed.
②
Make sure with the guard cover provided
that distance between Finished Wall surface and
valve falls between MIN and MAX.
Caution
From Thermostatic
Mixing Valve
Hand Shower
Adapter
1/2” pipe
Guard cover
Single Vol
Control
Valve
TOTO mark on top