10
Meaning of the indications
This operation must be conducted by a contractor.
Operation that must be checked.
,QGLFDWHVWKHZRUNÀRZ
Building a base for the bathtub
B-11
B-8
B-6
B-7
1
+ aPP
Waterproof
Tile
/ aPP
Please conduct site operation directly on the drain.
When embedding a power cable for the bathtub on the installation side, please use a sheath tube with
an inner diameter of less than 20 mm.