MAINTENANCE INSTRUCTIONS
HALON 1 / 1,2 / 2,5 AIR TOTAL
ATA 26-24-05
I 74/76-00 dated May 2014
Page 9 of 13
Subject to change without notice
Replaces H 74/76-00 dated October 2012
Release: May 2014
(3)
Determination of total weight:
After the fill process is completed and the extinguisher disconnected from the fill line, the
extinguisher must be placed back on the scale again to determine the total weight. This
weight must be entered in the inspection record card and on the extinguisher check note
(when weighing the extinguisher, the weight of seal, seal wire and the approval label must
be included).
Seal the extinguisher (Seal wire tensile strength 40 N).
(4) Acceptance of filled extinguisher:
Acceptance and clearance of the extinguisher must be made by authorized staff.
Acceptance test:
General visual inspection of the extinguisher
Checking operating pressure (see page 5 technical data)
Tightness control. Checking the unit after 3 weeks in storage