STEP • 14
STEP •15
08
Per Overhang
TACKS PROVIDED
ATTACH THE ROOF FELT
Use the felt lengths
provided.
14a.
Apply the roof felt as shown.
Apply lower levels first to create correct rain run off
positions.
14b.
Using a hammer, tack down the felt with the tacks provided in a
neat fashion.
14c.
Trim down excess felt with a stanley knife.
Remember to overlay the 1st felt to avoid rain leaks.
14d.
Tuck and fold edges neatly and tack in place to
hide any loose edges. Check that all areas are covered
and there are no holes to avoid any rain water
getting through your felt roof.
ROOF FELT
3rd
= Drill Points using
screws provided as shown
x2
4.0 x 70mm
Per Floor Section
x3
x8
4.0 x 38mm
FELT STRIPS
ATTACH FELT STRIPS
Create the Final Roof
Edges.
Final steps finishing off
the roof.
NOTE:
Location of the Felt Strips
3c.
Felt Strips must be same height as roofing felt
to allow rain water to run off. See Diagram on the
right.
15a
. Using the felt strips provided cover the edges of the roof front and back apex.
15b
. Drill in the felt strips as shown on fornt and back of the shed to finish the roof off. Use the
framework of the roof blocks to screw the felt strips into.
© Sheds (Midlands) Limited 2021
www.totalsheds.co.uk