
Greyline 2000 Series Operator Workstation Hardware Manual
Chapter 7 - Power On and Self Test
••••
25
Chapter 7 - Power On and Self Test
Power On
To power on, simply plug in the Greyline Operator Workstation unit.
Note:
If there is no power, check to be certain that you have connected power to the
unit, that you have correct polarity and the proper supply (AC, DC, ample
current). Refer to the sections which discuss connections and specifications.
Self Test
Self Test automatically occurs when the unit is powered on. Upon completion of self test, the display
prompts:
TOTAL CONTROL PRODUCTS
SELF TEST PASSED
Note:
If the unit does
not
pass the Self Test, it is possible that you have a defective
unit. Contact Total Control Products, Inc.
Local Self Test
Switches 1, 2 and 3 of the Dip Switch must be set to the "Off" position (Test mode) for Local Self Test.
O FF
O N
1
2
3
4
5
6
7
8
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for Greyline 2000 Series
Page 7: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 9: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 25: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...
Page 29: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com...