Air Handlers
9
A
B
4.3 Piping Work
4.3.1 Specification of Connection Pipe
Model
External diameter (inch)
Gas pipe
Liquid pipe
Φ
3/4
Φ
3/8
4.3.2 Piping Preparation
4.3.2.1 Solder Connection
All cut ends are to be round, burr free, and cleaned. Failure to follow this
practice increases the chances for refrigerant leakage.
TU24-24AADU
TU36-24AADU
TU48-24AADU
TU60-24AADU
Summary of Contents for TU24-24AADU
Page 28: ......