I−08090801
Remove the Gear Box cover from the Gear
Box taken from the Head Rail.
∗
The latches are easier to remove if removing
the bottom one then the upper one. Remove
the two pulley drums from the main Gear
Box unit. Insert the Operation Cord into the
groove of the pulley and wrap it around the
back.
∗
When removing the Gear Box, the pulley
drums may come off. Be sure to not lose
them.
Gear Box
Remove the
Gear Box Cover
Remove the Cord Guide
Roller from Gear Box
Latch (Up)
Latch (Down)
P. 10
P. 11
Place the Operation Cord in the specified
position and attach as illustrated.
Reattach the Cord Guide Roller at the rear hole
and attach the Gear Box Cover.
Attach the Cord
Guide Roller
Attach the
Gear Box Cover
Insert the Gear Box on the opposite side of the Head Rail. Confirm that the Shaft is inserted
into the Gear Box, and secure with the screw. Finally, attach the Head Cap to the opposite side
of the Head Rail.
∗
When attaching the Gear Box/Head Cap to the Head Rail, push in until they click into place.
Insert the Shaft and
secure with the screw
Attach the
Head Cap
Attach the
Gear Box
Head Rail