WX9 ASD Installation and Operation Manual
29
Startup and Test
Perform the following checks before turning on the unit:
•
R/L1
,
S/L2
, and
T/L3
are connected to the three-phase input power.
•
U/T1
,
V/T2
, and
W/T3
are connected to the motor.
• The three-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• Front door is closed and all enclosure panels are securely fastened.
• All personnel are clear of the area of the installation and the driven equipment.
Save User Settings
Use the following table to record any changed parameters for future reference.
Table 6. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD
ID__________Name:______________________Date:_______
Notes
Param
Number
Parameter Name
Default or Previous
Setting
New Setting
Unit of
Measure
Note:
Settings may also be recorded via Program
Utilities
Type Reset
Summary of Contents for WX9 ASD
Page 2: ......
Page 3: ...DN 68940 000 March 2014 WX9 ASD Installation Operation Manual ...
Page 4: ......
Page 12: ...iv WX9 ASD Installation and Operation Manual ...
Page 225: ......