![Toshiba TECRA S10 Maintenance Manual Download Page 316](http://html.mh-extra.com/html/toshiba/tecra-s10/tecra-s10_maintenance-manual_424548316.webp)
4 Replacement Procedures
4.28 Touch pad/Fingerprint sensor board
Installing the Touch pad/Fingerprint sensor board
To install the touch pad/fingerprint sensor board, follow the steps below and refer to Figure
4-50 to 4-53.
1.
Connect the
touch pad button FFC
to the
connector
on a new touch pad and stick
the
touch pad
in place.
2.
Set the
fingerprint sensor board
to the unit dual pad and secure them with the
following
screws
.
•
M2.0
×
3C
S-THIN HEAD screw
×
2
3.
Set the
unit dual pad
(with the fingerprint sensor board) in place.
4.
Connect the
touch pad FFC
,
touch pad button FFC
and
dual button FFC
to the
connector
CN9650
and
CN3240
on the fingerprint sensor board and
connector
on the
touch pad.
5.
Turn up the
insulator
(TPAD PLT INSULATOR) and secure the touch pad plate
(with the fingerprint sensor board) with the following
screws
.
•
M2.5
×
4B
FLAT HEAD screw
×
4
6.
Stick the
insulator
(SQUARE INSULATOR) in place.
NOTE: Stick the insulator (SQUARE INSULATOR) aligning to the guide lines as shown
in the figure below.
Insulator
(SQUARE INSULATOR)
Hole for screw
Line
4-84 [CONFIDENTIAL] TECRA
A10/S10/P10/SatellitePro S300 Maintenance Manual (960-684)