4 Replacement Procedures
4.17 Touch Pad and Button Board
4
-
52
Satellite L300D/L305D/ Satellite Pro L300D/ EQUIUM L300D/ SATEGO L300D Maintenance Manual
Installing the Touch Pad and Button Board
Install the touch pad and button board according to the following procedures and Figure 4-31.
1. Seat the touch pad, touch pad bracket in the correct position and secure it with the
eight M2x3 black flat head screws.
2. Connect the button board flat cable to CN5001 on the button board.
3. Seat the button board in the correct position and secure it with the two M2x3 black
flat head screws.
4. Connect the touch pad flat cables to CN5000 on the button board and touch pad.
Summary of Contents for Satellite L300 Series
Page 13: ...Chapter 1 Hardware Overview ...
Page 62: ...Chapter Diagnostic Programs ...
Page 65: ......
Page 99: ...3 Diagnostic Programs 3 5 System Test 34 ...
Page 119: ...3 Diagnostic Programs 3 10 Peripheral 54 NOTE 1 AMD platform can t support this Test item ...
Page 129: ...Chapter 4 Replacement Procedures 4 1 ...
Page 190: ...6000 1 Appendices ...