No.
Part name
Compressor
Procedure
1)
Perform work of item 1 of
and
,
,
,
.
2)
Extract refrigerant gas.
3)
Remove the partition
plate.
(ST
2
TØ4 × 10L 4 pcs.)
4)
Remove the sound-insulation material.
5)
Remove terminal cover of the compressor,
and disconnect lead wire of the compressor
from the terminal.
6)
Remove pipe connected to the compressor
with a burner.
• Take care to keep the 4-way valve away
from naked flames. (Otherwise, it may
malfunction.)
7)
Remove the fixing screw of the bottom plate
and heat exchanger. (ST
2
TØ4 × 10L 1 pc.)
8)
Remove the fixing screw of the bottom plate
and valve fixing plate.
(ST
2
TØ4 × 10L 2 pcs.)
9)
Pull upward the refrigeration cycle.
10)
Remove NUT (3 pcs.) fixing the
compres-sor to the bottom plate.
Remarks
Reactor
1)
Perform work of item 1 of
, and
.
2)
Remove screws fixing the reactors.
(ST
2
TØ4 × 10L
2
pcs.)
NOTE
Never reuse the compressor lead which you
disconnected. Use the new one. If you reuse
it, it may malfunction.
FILE NO. SVM-18041
- 80 -