![background image](http://html.mh-extra.com/html/toshiba/p9/p9_installation-and-operation-manual_424998044.webp)
34
P9 ASD Installation and Operation Manual
EOI Remote Mounting Using the ASD-MTG-KIT-P9
Note:
for the dimensions and the item locations referenced in steps
through
.
1.
At the EOI mounting location, mark the 4.60” by 4.50” hole and the four 11/32” screw holes.
2.
Cut the 4.60” by 4.50” rectangular hole.
3.
Drill the four 11/32” holes for the Bezel Plate mount.
4.
Attach and secure the Bezel Plate to the front side of the mounting location using the four 10-32
hex nuts, #10 split lock washers, and the #10 flat washers.
5.
Attach and secure the EOI to the front side of the Bezel Plate using the four 6-32 x 5/16” pan head
screws, #6 split lock washers, and the #6 flat washers.
6.
Connect the extension cable.
EOI ASD-MTG-KIT-P9 Mounting Dimensions
Figure 26. EOI Bezel Plate Mounting Dimensions.
SD-MTG-
IT-P9
Summary of Contents for P9
Page 2: ......
Page 3: ...Document Number 64054 004 February 2013 P9 ASD Installation Operation Manual TM ...
Page 4: ......
Page 305: ......