21-
EN
TOUCH SCREEN CONTROLLER for Air Conditioning Control System
Owner's Manual
[5] Changing, copying, and deleting master schedules in the Running Schedule screen
▼
Changing a master schedule
(1) Tap the [Edit] icon
<1>
for the name of the master schedule you want to edit.
The Master Schedule Weekly Pattern Settings screen appears.
(2) Edit the master schedule in the same way you created it.
▼
Copying a master schedule
(1) Tap the "Master schedule name"
<2>
for the one to copy.
(2) Tap the [Copy] icon
<3>
.
The copied master schedule is created.
▼
Deleting a master schedule
(1) Tap the "Master schedule name"
<2>
for the one to delete.
(2) Tap the [Delete] icon
<4>
.
The confirmation screen appears.
(3) Tap the [OK] button.
The master schedule is deleted.
<1>
<1>
<2>
<2>
<3>
<3> <4>
<4>
[Running Schedule screen]
Summary of Contents for BMS-CT5121E
Page 68: ...DEA3319001 ...