background image

NOTE:

TO REMOVE SHROUD,

LOOSEN AND REMOVE

6 SCREWS AS SHOWN

BOTTOM VIEW

11

INSPECTION & LUBRICATION
INSPECTION:

ATTENTION:

PLEASE ENSURE THAT ALL TIRES ARE INFLATED

TO 30 PSI.  FAILURE TO DO SO MAY RESULT IN 

TANK VEERING DURING USE.

Once a month, check for loose bolts on frame and 

wheels.  Tighten if necessary.

Once a month, remove shroud and check that the 

chain and sprockets are clean, free of rust, dust 

and grime.  Make sure that the chain is properly 

lubricated.

LUBRICATION:

Once a month, the sprockets should be cleaned and 

the chain should be lubricated.

RECOMMENDED LUBRICATION: Use a Dry lubrication 

for indoor use, and wet lubrication for outdoor use.  

Most bicycle shops carry a variety of different 

lubricants and can recommend a lubricant based on 

the conditions where the TANK will be used.      

 

Summary of Contents for TANK

Page 1: ...TANK Assembly Guide PART 5706201 A VERSION XTTM1 RPH 101 ...

Page 2: ...R WHEEL 10 DIA X 3 WIDE 2 7 2010901 WASHER LOCK M12 SAE ST ZN 2 8 2011301 SCREW M12 1 75 X 30L SOC HD GR 12 9 CLEAR ZINC 2 9 56930PA PTD ASSY RH PUSH HANDLE 1 10 56931PA PTD ASSY LH PUSH HANDLE 1 11 57144PA PTD ASSY UPPER MOUNT OPTIONAL 1 12 57145PA PTD ASSY LOWER MOUNT OPTIONAL 1 13 2001101 WASHER FLAT 3 8 SAE ST ZN 8 14 2031101 SCREW 3 8 LAG X 2 5 L CLEAR ZINC 8 2 TABLE OF CONTENTS TANK ASSEMBLY...

Page 3: ...50 180 3 190 150 170 160 6 130 140 120 90 110 100 40 30 10 70 60 20 80 1 2 4 5 7 200 2 1 3 4 3 NOTE LOOSELY tighten bolt connections in this step STEP 1 ...

Page 4: ...0 1 2 4 5 7 200 2 6 5 7 8 NOTE BEFORE ASSEMBLING TIRES CHECK TIRE PRESSURE MAKE SURE TIRES ARE INFLATED TO 30 PSI NOTE AFTER TIRES HAVE BEEN SECURELY ASSEMBLED SECURELY TIGHTEN THESE BOLTS 4 NOTE SECURELY tighten all bolt connections in this step and previous step STEP 2 ...

Page 5: ... LABEL ON THE LEFT HANDLE WITH THE L LABEL ON THE REAR FRAME NOTE ALIGN THE R LABEL ON THE RIGHT HANDLE WITH THE R LABEL ON THE REAR FRAME 2 NOTE ALIGN THE PIN IN THE PUSH HANDLES WITH THE SLOT IN THE RECEIVER TUBE 5 STEP 3 ...

Page 6: ...HE WALL USING FOUR WALL ANCHORS SUITABLE FOR THAT PARTICULAR WALL CONSTRUCTION XTWMH WALL MOUNT HANGER OPTIONAL NOTES The images above show the anchoring hardware used for attaching to typical walls with wood studs spaced 16 on center The anchors used will depend on the wall construction In all cases at least four anchoring locations must be used The pull out strength of the anchoring bolts used m...

Page 7: ...NOTE THE FRONT TIRE WILL REST ON THIS SURFACE WHEN STORED 11 12 2 XTWMH WALL MOUNT HANGER OPTIONAL 7 ...

Page 8: ...NOTE ALIGN THE PIN IN THE PUSH HANDLES WITH THE SLOT IN THE RECEIVER TUBE 2X 10 9 12 8 XTWMH WALL MOUNT HANGER OPTIONAL ...

Page 9: ... SPRING PIN AND ROTATE TOW BAR FORWARD UNTIL IT ENGAGES FRONT HOLE ATTACH TOW STRAP HERE NOTE THE TOW BAR MUST BE ADJUSTED FORWARD TO ADD WEIGHT PLATES TO THE WEIGHT HORN TOW BAR 9 XTTM1 TOW BAR ADJUSTMENT ...

Page 10: ...PULL BACK ADJUSTER TO INCREASE RESISTANCE POSITION N NEUTRAL POSITION 1 LOW RESISTANCE POSITION 2 MEDIUM RESISTANCE POSITION 3 HARD RESISTANCE 10 XTTM1 RESISTANCE ADJUSTMENT ...

Page 11: ...necessary Once a month remove shroud and check that the chain and sprockets are clean free of rust dust and grime Make sure that the chain is properly lubricated LUBRICATION Once a month the sprockets should be cleaned and the chain should be lubricated RECOMMENDED LUBRICATION Use a Dry lubrication for indoor use and wet lubrication for outdoor use Most bicycle shops carry a variety of different l...

Reviews: