![Toro Z MASTER Z100 series Setup Instructions Download Page 9](http://html1.mh-extra.com/html/toro/z-master-z100-series/z-master-z100-series_setup-instructions_1132652009.webp)
9
Step
9
Checking the Spindles for
Grease
Parts needed for this step:
Qty.
Part
1 tube
Number 2 general purpose lithium base or
molybdenum base grease. (Purchase
separately.)
Procedure
Important: Check the cutting unit spindles to
make sure they are greased before starting the
engine.
1.
Remove the belt covers.
2.
Grease the fittings on the three spindle bearings.
m–5531
Step
10
Preparing the Side
Discharge Chute
Parts needed for this step:
None
Procedure
Remove the plastic tie holding the side discharge
chute up and lower the chute into place.