Installation
11
Installing the Canister
1.
Assemble the support bracket into the bagger
mount with (2) 3/8”-13 x 3/4” (19 mm) bolts and
locknuts (Fig. 15).
2.
Install the bagger mount over pin inside rear
traction frame cross member (Fig. 15).
3.
Lift latch levers and install mounting rod
(Fig. 15).
4.
Secure latch levers closed with clevis pins and
hairpin cotters (Fig. 15).
9
1
6
3
4
2
7
8
5
m–2805
Figure 15
1.
Bagger Mount
2.
Support Bracket
3.
3/8”-16 x 3/4” (19 mm)
Bolt
4.
3/8” Locknut
5.
Pin
6.
Clevis pin
7.
Latch lever
8.
Mounting rod
9.
Hairpin cotter
5.
Align the canister support over the bagger mount
tubes and slide down (Fig. 16).
6.
Assemble the spring anchor bolts to the canister
support brackets. Thread a locknut partway onto
the 3/8”-16 x 2-1/4” (57 mm) bolt. Install the
bolt into the bracket with the head toward the
inside. Install a second locknut onto the end and
tighten the inner locknut so bolt extends inward.
Repeat for the second bracket (Fig. 16).
7.
Slide the top assembly pivot bolts into the slots
of the canister support brackets. Retain the top
assembly with springs hooked between the top
anchor bolts and the spring anchor bolts in the
canister support brackets (Fig. 16).
m–2806
2
5
1
8
3
7
6
4
Figure 16
1.
Anchor Bolt (2)
2.
Top Assembly
3.
Spring (2)
4.
3/8”-16 x 2-1/4” 57 mm)
Bolt (2)
5.
Locknut (4)
6.
Canister Support
7.
Tube (typical)
8.
Bagger Mount
Summary of Contents for Z MASTER 79402
Page 20: ......