Pre-Maintenance Procedures
Preparing for Maintenance
1.
Park the machine on a level surface, press the
enable/disable switch to the D
ISENGAGE
and position,
lower the cutting units, and engage the parking brake.
2.
Shut off the engine, remove the key, and wait for all
moving parts to stop.
3.
Wait for the engine to cool.
Opening the Hood
1.
Release the 2 hood latches (
g369009
Figure 96
1.
Hood latch (2)
2.
Rotate open the hood.
Closing the Hood
1.
Carefully rotate the hood closed (
g369219
Figure 97
1.
Hood latch (2)
2.
Secure the hood with the 2 hood latches.
Opening the Screen
1.
Remove the ball pin from the screen latch (
).
g378175
Figure 98
1.
Ball pin
2.
Screen latch
2.
Unlatch and open the screen.
Closing the Screen
1.
Close and latch the screen (
).
52