Toro 86001 Installation Instructions Download Page 2

Installation

2

6.

Place baffle inside mower location two (2) studs
on baffle, into front linkage bracket holes
(Fig. 2).

7.

Place (2) 3/8 x 1-1/4” (32 mm) carriage bolts
through rear linkage bracket holes. Secure
carriage bolts and studs with (4) 3/8” locknuts
(Fig. 2).

8.

Tighten all mounting hardware securely.

2

1

m–2874

3

3

Figure 2

1. Stud
2. Bolt 3/8–16 x 1-1/4”

(32 mm)

3. Lock nut 3/8”

Install Recycler

 Blades

1.

Install Recycler

 blades from kit. Secure with

washer, blade, flat washer, and the blade nut
(Fig. 3).

Note:

Do not install anti-scalp cups as they
interrupt the airflow for Recycling.

IMPORTANT: The curved part of the blade
must be pointing toward the inside of the
mower to assure proper cutting.

2.

Tighten the bland nut to 80-100 ft–lb
(109-136 Nm).

3.

Rotate blades to assure there is at least 1/8”
clearance between blades and baffle.

1

2

3

4

5

Figure 3

1. Nut
2. Flat washer – thick
3. Blade

4. Washer – thin
5. Spindle

Install Recycler

 Decal

1.

Remove backing paper and apply decal to both
sides of mower (Fig. 4). Smooth from center to
edges to remove air bubbles.

1 & 2

1 & 2

M–2829

Figure 4

1. Mower side

2. Apply decal

2.

Install mower onto traction unit; refer to traction
unit Operator’s Manual.

Reviews: