Figure 50
1.
Front of vehicle
3.
Center to center distance
2.
0 ± 0.12 inch (0 ± 3 mm)
front to rear of tire
3. Adjust the center-to-center distance as follows:
A. Loosen the jam nut at the center of the tie rod
Figure 51
1.
Tie rods
2.
Jam nuts
B. Rotate the tie rod to move the front of the tire
inward or outward to achieve the center to center
distances from front to back.
C. Tighten the tie rod jam nut when the adjustment
is correct.
D. Check to ensure that the tires turn an equal
amount to the right and to the left. If the tires do
not turn equally, refer to the Workman Service
Manual for the adjustment procedure
Cooling System
Maintenance
Removing Debris from the
Cooling System
Service Interval:
Before each use or daily (Clean more
frequently in dirty conditions.)
1. Turn the engine off. Clean the engine area
thoroughly of all debris.
2. Remove the (5) bolts securing radiator screen/guard
to the radiator The guard is not shown in the figure.
(Figure 52). Remove the screen/guard.
Figure 52
1.
Radiator screen
2.
Mounting bolts
3. If equipped with a high flow hydraulic kit, rotate
the latches and pivot the oil cooler away from the
radiator (Figure 53).
Figure 53
1.
Radiator housing
3.
Latches
2.
Oil cooler
4. Clean the radiator, oil cooler, and screen thoroughly
with compressed air.
43
Summary of Contents for 7354
Page 35: ...Figure 34 Figure 35 Figure 36 35 ...
Page 36: ...Figure 37 36 ...
Page 51: ...Schematics Hydraulic Schematic Rev A 51 ...
Page 52: ...High Flow Hydraulics Schematic Optional Rev A 52 ...
Page 53: ...Electrical Schematic Rev A 53 ...
Page 54: ...Notes 54 ...
Page 55: ...Notes 55 ...