Toro 41228 Installation Instructions Manual Download Page 16

slow or no foam production, remove and clean the
strainer.

1. Position the vehicle on a level surface, set the parking

brake, stop the pump, stop the engine, and remove
the ignition key.‘

2. Relieve pressure within tank by flipping the pressure

release valve into the upright position (Figure 32).

3. Clamp liquid hose and remove from hose barb.

4. Unscrew nozzle body and hose barb from nozzle

adapter and solenoid assembly. Remove strainer
(Figure 34).

Important:

Use a back up wrench on the nozzle

adapter while unscrewing the nozzle body
to avoid unnecessary torque on the solenoid
assembly.

Figure 34

1.

Hose barb

4.

Nozzle adapter

2.

Nozzle body

5.

Solenoid assembly

3.

Strainer

6.

Liquid hose

5. Inspect and clean strainer. Replace if necessary.

6. Assemble strainer and nozzle body/hose barb

as shown in Figure 34 and install into nozzle
adapter/solenoid assembly.

7. Attach liquid hose to hose barb and un-clamp.

8. Flip pressure release valve to the down position.

If the problem persists, please contact your local
Authorized Toro Distributor.

Storage

1. Remove the couplers on top of the tank.

2. Loosen and unhook the foam marker tank strap.

3. Remove the tank from the bracket, remove the tank

lid, and empty the contents of the tank.

4. Rinse and flush the inside of the tank.

5. Install the lid on the tank.

6. Attach the couplers.

7. Strap the tank into place.

16

Summary of Contents for 41228

Page 1: ...ons Note If you are installing this kit on a machine equipped with a cab a bracket from Custom Products part number 2 15904 needs to be installed as well to eliminate the interference with the cab Not...

Page 2: ...Install the tank compressor and mixer Bolt 3 8 x 1 inch 1 Locknut 3 8 inch 1 Mixer assembly 1 2 Flat washer 3 8 inch 2 Install the mixer tee Wiring harness 1 Hose clamp small 6 3 Plastic ties 12 Wire...

Page 3: ...ter bracket to the right side of the vehicle above the battery Figure 1 using 4 carriage bolts 3 8 x 1 1 4 inches and 4 flange locknuts 3 8 inch Note It is easiest if you remove the battery before per...

Page 4: ...Figure 4 1 Tank compressor assembly 3 Bolt 3 8 x 1 inch 2 Multi Pro 1200 series adapter bracket 4 Flat washer 3 8 inch Multi Pro 5600 5700 Turf Sprayer 1 Remove 4 bolts 1 4 x 1 inch and flat washers...

Page 5: ...the cover and fasteners aside 3 Mark a 108 inch supply hose with a black marker at each end Figure 9 Figure 9 1 Compressor hose 3 To the mixer tee 2 Needle valve hose 4 Connect the marked supply hose...

Page 6: ...rough the Workman adapter bracket and cover into the tank compressor assembly Figure 11 12 Remove the left handle and fasteners from the left side of the tank skid Save fasteners for later use 13 Moun...

Page 7: ...ft supply hose to the left side solenoid assembly 7 Secure both hoses with small hose clamps Figure 14 For all sprayers serial number 260000001 and higher 1 At the rear of the machine mount the mixer...

Page 8: ...plug the harness connectors into the boom solenoid assemblies Plug the connector with the blue wire to the right solenoid plug the connector with the orange wire to the left solenoid Figure 18 Figure...

Page 9: ...of the sprayer Figure 22 A Plug the connector with the yellow blue wire into the left boom solenoid B Plug the connector with the blue green wire into the right boom solenoid Figure 22 1 Mixer tee ass...

Page 10: ...e assembly Figure 25 Figure 25 1 Control panel 3 Foam marker switches 2 Latch 3 Remove the foam marker switch hole plugs 4 Install the 2 rocker switches into the switch panel Note Ensure that the notc...

Page 11: ...cal 2 Fuse block 5 Completing the Installation Parts needed for this procedure 2 Boom hose 2 Grommet 2 Punched hole boom cap 2 Extension hose 2 Hose clamp large 1 Parts catalog Procedure For all spray...

Page 12: ...the punched hole boom cap until it extends 2 to 3 inches past the cap Figure 29 8 Install the boom cap into the end of the boom pipe Figure 29 9 Lubricate the inside of the extension hose and slide it...

Page 13: ...h the punched hole boom cap until it extends 2 to 3 inches past the cap Figure 31 Figure 31 1 Top bar boom frame 4 Hose clamp 2 Boom hose 5 Extension hose 3 Cap 6 Assembled 5 Install the boom cap onto...

Page 14: ...Density 1 Ensure that both the left and right boom switches located on the console are in the Off position The contents of the foam marker tank are under pressure Loosening the fittings on the tank c...

Page 15: ...justment valve completely B Operate for 2 minutes C Wait 1 minute and then check the consistency of the foam D Adjust the foam to achieve the desired consistency Maintenance Recommended Maintenance Sc...

Page 16: ...d assembly Figure 34 1 Hose barb 4 Nozzle adapter 2 Nozzle body 5 Solenoid assembly 3 Strainer 6 Liquid hose 5 Inspect and clean strainer Replace if necessary 6 Assemble strainer and nozzle body hose...

Reviews: