Figure 5
1.
Spray Pro monitor
3.
Flange-head bolts,
1/4 x 3/4 inch
2.
Bracket
4.
Knob
3. Loosely install the 2 carriage bolts, rubber
washers, and knobs on the bracket as illustrated in
Figure Figure 5 and Figure 6.
Note:
Install the carriage bolts and rubber washers
inside of the bracket and the knobs on the outside.
Figure 6
1.
Carriage bolt
3.
Knob
2.
Rubber washer
4.
Bracket
4. Remove the large grommet from the hole in the dash
and thread the cables on the monitor through the
grommet and the dash.
5. Install the grommet into the dash.
6. Install the Spray Pro monitor over the carriage bolt
heads (Figure 5) and tighten the knobs to secure it.
7. Connect the Spray Pro wire connectors to the wire
connectors located under the dash (Figure 7).
Figure 7
1.
Connectors from the
sprayer
2.
Connectors from the
monitor
3
Completing the Setup:
Learning more about your
product.
Parts needed for this procedure:
1
Ignition key
1
Operator’s Manual
1
Engine Operator’s Manual
1
Parts Catalog
1
Operator Training Material
1
Registration Card
1
Pre-delivery Inspection Sheet
Procedure
1. Read the manuals.
2. View the Operator training material.
3. Complete the registration card and return to Toro.
4. Store the documentation in a safe place.
15
Summary of Contents for 41179
Page 62: ...Schematics Electrical vehicle Rev B 62...
Page 63: ...Electrical spray system Rev A 63...
Page 64: ...Hydraulic Rev A 64...
Page 66: ...Notes 66...
Page 67: ...Notes 67...