10
Installing the New Belt Cover
Bracket Upon Removal of the
Kit
(For Model 31212 Only)
Parts needed for this procedure:
1
Belt cover bracket
2
Carriage bolt (1/4 x 3/4 inch)
2
Locknut (1/4 inch)
Procedure
1.
Drill 2 holes (0.266 inch or drill size H) into the top
deck assembly with a sharp drill bit; refer to
for the correct positioning.
Figure 21
1.
9.5 cm (3.75 inches)
3.
1.9 cm (0.75 inch)
2.
4.5 cm (1.75 inches)
2.
Install the new belt cover bracket with 2 carriage bolts
(1/4 x 3/4 inch) and 2 locknuts (1/4 inch) as shown
in
.
Figure 22
1.
Locknut (1/4 inch)
3.
New belt cover bracket
2.
Drilled hole
4.
Carriage bolt (1/4 x 3/4
inch)
11
Installing the Throttle Stop
For CE Compliant GM7200 or GM7210
International Machines with Kubota
Engines
Parts needed for this procedure:
1
Throttle stop
Procedure
Note:
This procedure is only for CE compliant GM7200 or
GM7210 international machines with a Kubota
®
engine.
1.
Remove the nut and washer securing the speed control
lever to the governor shaft (
Figure 23
1.
Throttle stop
3.
Speed-control lever
2.
Nut and washer
2.
Insert the throttle stop onto the governor shaft so the
tab rests against the flat on the speed-control lever
(
).
3.
Install the washer and nut onto the shaft and torque to
9.7 to 12.0 N∙m (86 to 106 ft-lb).
11