![Toro 22983 Operator'S Manual Download Page 20](http://html1.mh-extra.com/html/toro/22983/22983_operators-manual_1131235020.webp)
After Operation
After Operation Safety
•
Park the machine on a level surface, disengage
the trencher hydraulics, lower the boom, engage
the parking brake, shut off the engine, and remove
the key. Wait for all movement to stop and allow
the machine to cool before adjusting, servicing,
cleaning, or storing it.
•
Clean debris from the attachments, drives,
mufflers, and engine to help prevent fires. Clean
up oil or fuel spills.
•
Keep all parts in good working condition and all
hardware tightened.
•
Use care when loading or unloading the machine
into a trailer or truck.
Securing the Machine for
Transport
Important:
Do not operate or drive the machine
on roadways. Use care when loading or unloading
the machine into a trailer or truck.
1.
Park the machine on a level surface, engage
the parking brake (if applicable), and lower the
boom.
2.
Shut off the engine and remove the key.
3.
Secure the machine to a trailer with chains or
straps using the tie-down/lift loops at the front
and rear of the machine (
and
). Refer to your local ordinances for trailer and
tie-down requirements.
g251915
Figure 17
1.
Front tie-down loop
g251916
Figure 18
1.
Rear tie-down loops
Lifting the Machine
You can lift the machine using the tie-down/lift loops
as lift points (
and
20
Summary of Contents for 22983
Page 50: ...Notes...