Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Prepare the machine.
2
No parts required
–
Remove the existing blades.
3
No parts required
–
Remove the existing baffle.
Discharge plate
1
Carriage bolt (5/16 x 7/8 inch)
1
Flange nut (5/16 inch)
1
Flange nut (3/8 inch)
2
4
Carriage bolt (3/8 x 1 inch)
2
Install the discharge plate.
Left baffle
1
Center baffle
1
Right baffle
1
Flange nut (3/8 inch)
9
5
Carriage bolt (3/8 x 1 inch)
9
Install the baffles for 48-inch and 52-inch
mower decks.
Left baffle
1
Center baffle
1
Right baffle
1
Flange nut (3/8 inch)
9
6
Carriage bolt (3/8 x 1 inch)
9
Install the baffles for 60-inch mower
decks.
7
No parts required
–
Install the new blades.
8
No parts required
–
Tighten all fasteners.
2
Summary of Contents for 144-0386
Page 11: ...Notes ...
Page 12: ......