Figure 24
1.
Retainer
4.
T-fitting
2.
90° barbed fitting (sprayer
supply hose)
5.
Pressure-relief valve
3.
Front of the machine
4.
Remove the 90° barbed fitting from the T-fitting
(
).
5.
At the top of the of the sprayer tank, remove the
retainer that secures the straight barbed fitting of the
bypass hose to the T-fitting (
).
Note:
Retain the retainers for installation in
the Bypass Hose—Machines without the Optional
Spray Wand Kit or Electric Hose Reel Kit (page 33)
.
Figure 25
1.
Retainer
3.
Straight barbed fitting
(bypass hose)
2.
T-fitting
6.
Remove the straight barbed fitting from the T-fitting
(
).
Removing the Agitation, Rate, and
Master-Spray Valves from the Machine
1.
While supporting the bracket for the agitation, rate,
and master-spray valves, remove the 3 flange-head
bolts (5/16 x 3/4 inch) that secure valve bracket to the
mount (
).
Figure 26
1.
Mount
3.
Flange-head bolts (5/16 x
3/4 inch)
2.
Bracket
2.
Remove the bracket, valves, hoses, and agitation
nozzles from the machine (
).
Note:
Retain the 3 flange-head bolts (5/16 x 3/4 inch)
for installation in
Installing the Agitation, Rate, and
Master-Spray Valve Manifold (page 24)
; you no longer
need the bracket, valves, hoses, and agitation nozzles.
Figure 27
15
Summary of Contents for 136-0372
Page 61: ...Schematics Flow Diagram Rev A 61...
Page 62: ...Notes...
Page 63: ...Notes...
Page 64: ......