Toro 120-7750 Installation Instructions Download Page 4

Important:

Before drilling, measure the dimensions on this diagram to verify that it is printed at the

correct size. Mounting the guard in the wrong location may result in a reduced range in the height-of-cut
or damage to the machine.

Figure 6

1.

Locate area on the deck.

3.

Center these marks on the existing holes.

2.

Place this edge of the template towards the front of the deck.

4.

Drill a 6.2 mm diameter hole.

4

Reviews: