Fusible Link Harness
g256582
Figure 77
1.
Starter motor
4.
To engine wire harness P22 connector
2.
Fusible link harness
5.
Fusible link for glow plug circuit
3.
To starter B+ terminal
6.
Fusible link for starter circuit
The Outcross 9060 uses two (2) fusible links for circuit protection. These fusible
links are located in a harness that connects the starter B+ terminal to the engine
wire harness. If either of these links should fail, current to the protected circuits
will be interrupted.
Testing the Fusible Link Harness
1. Locate and unplug the fusible link harness connector from the engine wire
harness.
2. Use a multimeter to make sure that continuity exists between the fusible
link terminals.
Note:
It is not recommended to replace individual fusible link conductors of
the fusible link harness. If any of the harness links are open (failed), replace
the entire fusible link harness.
3. If either fusible link is open, replace the fusible link harness.
4. After fusible link testing is complete, make sure that the fusible link harness
is securely attached to starter B+ terminal and the engine wire harness.
Outcross 9060
Page 6–17
Electrical System: Electrical Component Testing
18234SL Rev B
Summary of Contents for 07511AA
Page 4: ...Reader Comments Page 4 Outcross 9060 18234SL Rev B ...
Page 18: ...Safety Safety and Instructional Decals Page 1 10 Outcross 9060 18234SL Rev B ...
Page 38: ...Specifications and Maintenance Special Tools Page 2 20 Outcross 9060 18234SL Rev B ...
Page 96: ...Engine Service and Repairs Page 4 24 Outcross 9060 18234SL Rev B ...
Page 208: ...Hydraulic System Service and Repairs Page 5 112 Outcross 9060 18234SL Rev B ...
Page 294: ...Electrical System Service and Repairs Page 6 86 Outcross 9060 18234SL Rev B ...
Page 384: ......