g343382
Figure 30
1.
Front-cable jam nut
3.
Brake cable
2.
Rear jam nut
Tightening the
Handle-Isolation Hardware
Service Interval:
After the first 20 hours
1.
Position the machine on a level surface.
2.
Loosen the bolt and nut as shown in
g343384
Figure 31
1.
Bolt
2.
Nut
3.
Push the handle as far forward as possible.
4.
While supporting the handle, torque the bolt and
nut that you loosened in step
to 68 to 75 N∙m
(50 to 55 ft-lb).
Note:
Have an assistant help you to support
the handle or torque the hardware.
5.
Release the handle.
31