Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Prepare the machine.
2
No parts required
–
Adjust the control-arm position.
3
Cutting units
5
Install the cutting units.
4
Finishing kit (sold separately)
1
Mount the finishing kits (finishing kits
are sold separately).
5
Cutting-unit kickstand
1
Install the cutting-unit kickstand.
6
No parts required
–
Install the 48 V disconnect jumper and
closing the seat base.
Hood lock, seal, and jam nut
1
7
Washer
1
Install the CE hood lock.
CE decal
1
Production year decal
1
8
Warning decal
1
Apply the CE decals.
Media and Additional Parts
Description
Qty.
Use
Key
2
Start the engine.
Operator's Manual
1
Read the Operator's Manual before operating the machine.
Engine owner’s manual
1
Use the manual to reference engine information.
Declaration of Conformity
1
Declaration of conformity
Operator training material
1
Review the material before operating the machine.
Note:
Determine the left and right sides of the machine from the normal operating position.
1
Preparing the Machine
No Parts Required
Procedure
1.
Park the machine on a level surface, lower the
cutting units, and engage the parking brake.
2.
Shut off the engine, remove the key, and wait for
all moving parts to stop.
3.
Check the tire air pressure before use; refer to
Checking the Tire Air Pressure (page 61)
.
Note:
The tires are overinflated for shipping.
Adjust the tire air pressure before operating the
machine.
4.
Check the hydraulic-fluid level; refer to
the Hydraulic-Fluid Level (page 68)
.
5.
Grease the machine; refer to
Bearings and Bushings (page 47)
.
11