TorcUP RAPTOR RP Series Repair Instructions Download Page 30

Install 1

st

stage gears

Summary of Contents for RAPTOR RP Series

Page 1: ...Repair Instructions 2nd Stage Raptor Replacement...

Page 2: ...Tools required 3 16 inch allen wrench pliers bin for balls...

Page 3: ...Remove ball plug with allen wrench...

Page 4: ...Showing plug removed...

Page 5: ...Place Raptor over bin so balls will drop into bin...

Page 6: ...Write here Rotate annulus alternately counter clockwise allowing balls to drop out...

Page 7: ...G Raptor_BreakApart expor Raptor_Asse mble 10 jpg Write here Showing a ball dropping out...

Page 8: ...Write here Continue turning until all balls are out and annulus comes from motor...

Page 9: ...Write here Pull apart gearbox from motor and check to ensure gears are in gear housing as shown...

Page 10: ...Write here Use socket to position gearbox vertically for stability...

Page 11: ...Write here Stable gearbox positioned...

Page 12: ...Write here Use pliers to remove 1st stage gears keep components on a clean surface...

Page 13: ...Write here Remove 2nd gear...

Page 14: ...Write here All gears removed...

Page 15: ...Write here Remove 1st stage carrier keep components on a clean surface...

Page 16: ...Write here Remove all three 2nd stage gears...

Page 17: ...Write here Remove 2nd stage carrier...

Page 18: ...Write here Old 2nd stage carrier on right new carrier shown on left...

Page 19: ...Write here Lubricate new 2nd stage carrier with Mobil synthetic grease...

Page 20: ...Write here Lubricate liberally as shown...

Page 21: ...Lubricate pins on carrier...

Page 22: ...Install new 2nd stage carrier...

Page 23: ...Firmly press down on carrier to ensure proper fit Gear box should rotate freely on socket...

Page 24: ...Reinstall gears onto on 2nd stage...

Page 25: ...Reinstall gear...

Page 26: ...Reinstall gear...

Page 27: ...Showing completed 2nd stage assembly...

Page 28: ...Install 1st stage carrier...

Page 29: ...Ensure 1st stage carrier is completely installed...

Page 30: ...Install 1st stage gears...

Page 31: ...Install 1st stage gears...

Page 32: ...Install 1st stage gears...

Page 33: ...Align motor and gear box...

Page 34: ...Showing properly aligned motor and gearbox...

Page 35: ...Turn sideways to expose hole for balls...

Page 36: ...Install 1st ball making sure ball drops completely into baring race...

Page 37: ...Install 1st ball making sure ball drops completely into baring race May require pulling gear box slightly away of motor to drop the balls in...

Page 38: ...Optional ball bearing assembly tool shown here but not required...

Page 39: ...After installing all balls number of approx balls is 35 Gearbox should rotate freely of motor...

Page 40: ...Reinstall ball plug using an allen wrench...

Page 41: ...Completed 2nd stage replacement...

Page 42: ...Repair Instructions 2nd Stage Raptor Replacement TorcUP Inc Headquarters Industrial Bolting Tools 1025 Conroy Place Easton PA 18040 USA www torcup com 1 888 TorcUP 1 1 610 250 5800 info torcup com...

Reviews: