5
Installation for Dual Gate
Step 1:
Disengage the clutches of the openers with the Release Key.
You can move the gates by hand, so the gates can swing freely during
installation of the Electric Lock.
Step 2:
With the gates in the closed position, determine the best location
for the lock and receiver. The lock and receiver must be level and aligned
with the openers. The lock and receiver should have a solid surface or tube
fence to provide stability.
Step 3:
For
Metallic Tube
gates, if the thickness of the fence post is bigger
than or equal to 3mm, you can thread on the fence post, and fasten the lock
and receiver only using bolts (without nuts). Otherwise, drill holes through
out the fence post, and fasten the lock and receiver with bolts, lock washers
and nuts.
Of course, you can weld them directly.
For
Chain Link
gates, you will need U-Bolts, saddles, lock washers and
nuts for the lock and receiver.
Step 4:
Recheck the lock’s position and alignment, make sure the electric
lock work correctly.
Step 5:
Connect the lock’s power cables to E-Plus board or the control
board of TOPENS swing gate opener refers to the
chapter “Wire
Connection of the LOCK”
.
Note:
Be sure that the clutches of the openers are engaged before
you prepare to activate your openers (Use the Release Key).