
iii
STANDARD SYSTEM COMPONENTS
• Please make sure that all of above items are in the box when you unpack.
*1) Batteries included in the package are to confirm the initial operation.
Please replace the batteries provided with new batteries (alkaline) as soon as possible.
1) Pipe Laser TP-L5..................................... 1pc.
2) Remote controller RC-200....................... 1pc.
3) Battery BT-53Q (rechargeable battery) ... 1pc.
4) AC/DC Converter AD-13 ......................... 1pc.
5) Battery adapter BA-2 ............................... 1pc.
6) Self-centering Feet
ø150mm .................................................. 4pcs.
ø200mm .................................................. 4pcs.
ø250mm .................................................. 4pcs.
ø300mm .................................................. 4pcs.
7) Single point foot....................................... 1pc.
8) Target....................................................... 1set
9) AAA Manganese battery
*1)
...................... 4pcs.
10) Carrying case .......................................... 1pc.
11) Instruction manual ................................... 1vol.