3
5.Assembly of the auxiliary oil tank package.
Take of the auxiliary oil tank package, tear off the stick surface, then stick it to the mounting groove of auxiliary
oil tank on the surface of wing.
7.Finished the assembly of “
”.
Hurricane MKIIB
4.Assembly of the vertical wing and horizontal wing.
Connect the elevator servo arm with rudder servo arm, then locate the clevis at the outermost hole on servo
arm.
Assemble processes
6.Assembly the antenna
Take of the antenna,then set it to the mounting groove at the back of fuselage.