50.Assemble the turbine and tail pipe to the fuselage.
53.Prepare the tail pipe mount.
51.Fuel tank ready.
54.Fix the tail pipe to the tail pipe mount.
52.Fix the fuel tank to the fuselage.
EDF installation steps for reference (All the devices
and accessories need purchased by customer
himself) First prepare a 0.6mm PVC Sheet, cut the
sizes as the picture below and glue them up.
第 13 页,共 17 页