7
3. Meter Post Installation
Remove four M8x15 Hexagon Bolts (24) and four Φ8 Curve Washers (37) from the tube of
Main Frame (1). Remove bolts with S6 Allen Wrench provided.
Insert the Meter Post(3) into the Cover for meter post(75)
Connect the Sensor Wire (26) from the Main Frame (1) to the Extension Sensor Wire (59) from
the Handlebar Post (3).
Put the Cable end of resistance cable of Tension Control Knob (7) into the cable lock of
Tension Cable (54). Pull the resistance cable of Tension Control Knob (7) up and force it into
the slot of metal bracket of Tension Cable (54). Insert the metal fitting on the resistance cable
of Tension Control Knob (7) into the hole at the end of slot in the metal bracket of Tension
Cable (54).
Connect the resistance cable of Tension Control Knob (7) to Tension Cable (54) complete.
Insert the Handlebar Post (3) onto the tube of Main Frame (1) and secure with four M8x15
Hexagon Bolts (24) and four Φ8 Curve Washers (37) that were removed. Tighten bolts with S6
Allen Wrench provided.
Tool:
Allen Wrench S6