4500B USER HANDBOOK
Page 24
4.2
Assembly Procedure
4.2.1
Rear Frame
Set the rear frame assembly in the centre of the working area with ample room surrounding it.
Set wooden blocks or bottle jacks under the rear frame to keep the floor of the bowl level.
Do not lift by inserting chains or slings inside the main pivot bearing as this will damage the
bearing and seals. If the sub assembly is to be lifted out of the shipping container, fit the 90
diameter pins into the pivot bearings and wrap slings around the pins.
Figure 4.1 Assembly Step 1
Summary of Contents for 4500B
Page 2: ...4500B User Handbook Page i...
Page 8: ...4500B USER HANDBOOK Page 2...
Page 18: ...4500B USER HANDBOOK Page 12...
Page 48: ...4500B USER HANDBOOK Page 42...
Page 50: ...9HUVLRQ 5 8 6 5 1 1R 3 7220 57 029 56 5 8 1 287 7 7 7220 57 029 56 20...
Page 58: ......