background image

4

6

5

Wind the Winch until the Winch Stap becomes 
taut (4a). Loosen the single 1/2” Dock 
Bracket Adjusting Bolt adjacent to the 
Leveling Hook (4b).

Tighten the 1/2” Dock Adjusting Bolt. 
Remove the Winch Leveling Assembly and 
repeat the procedure on the next Pipe Leg.

Note:

 Depending upon the amount of ad-

justment that is required to level the Dock 
Section, it may be necessary to repeat the 
previous leveling steps several times.

Lift or lower the Dock to achieve a level 
position.

1/2” Dock Bracket
Adjusting Bolt

Dock

Water Line

Bracket

4a

4b

1/2” Dock Bracket
Adjusting Bolt

Reviews: