background image

7

 

Assembling the Overhead Beater  cont

d

 

Attach the beater bottom to the sides by 
lining up the dowels on the beater bottom 
with the holes on the side piece. Note that 
the rubber bumpers on the beater face 
forward and the metal slides on the side 
pieces face the back. Tap the side piece to 
push onto the dowels. Fasten with a long 
bolt and wingnut—the wingnut should be 
on the back side.

 

Back side

 

Front side

 

Attach the beater cap to the sides with 
bolts and wingnuts, fastening near the 
top of the metal slides with the 
wingnuts facing the back. The cap can 
be moved up and down to accommo-
date different height reeds.

 

The top connector attaches to the side pieces with 
bolts and wingnuts (wingnuts can face either front 
or back).  We recommend using the 2nd or 3rd hole 
down to start, then adjusting as needed once you 
have your first warp on. (see 

Leveling the first 

warp

’ 

on page 13).

 

Summary of Contents for Eeva ES

Page 1: ...changeable 1 2x6 approx with holes the ends are narrower and have slots lower back cross piece 1 2x5 approx the ends are narrower and have slots lower front cross piece 1 2x4 approx the ends are narro...

Page 2: ...nto the shaft bar letting it sit in the second indentation This secures the rod onto the shaft bar Now take another shaft bar and slide it onto the other end of the metal rod and secure that with an O...

Page 3: ...es and place it into the hole at the bottom near the front of the loom This piece should be set in with the wide side parallel to the floor In sert another wedge into the slot at the end of that piece...

Page 4: ...d be in the upper position and tightened in place it sometimes loosens during shipping so that the gear and teeth are engaged In addition the pawl above the gear should be vertical and tightened so it...

Page 5: ...knee beams For packing purposes the blocks that hold the back beam are installed inside the castle sides fig 3 Unbolt these blocks and install them on the back of the castle sides fig 4 There are 2 p...

Page 6: ...it slide in Breast beam Back beam Knee beam Leveling the loom In order for the control mechanism to function properly the loom must sit level on the floor Check this by placing a level on the top edg...

Page 7: ...wingnut the wingnut should be on the back side Back side Front side Attach the beater cap to the sides with bolts and wingnuts fastening near the top of the metal slides with the wingnuts facing the...

Page 8: ...ng the control box on the rails This is best with 2 people as you will need to balance the box on the rails while attaching it Start by placing the 2 rails on a flat surface and hold them steady while...

Page 9: ...set of 3 holes furthest back on the side frame Measure the distance between the 2 rails with the box attached and use that measurement to determine which of those 3 holes to use and insert the dowel E...

Page 10: ...s in the bench legs this will allow you to adjust the seat to your comfort level Hanging the shafts text from video tutorial Installing the pulleys To install the pulleys find the three long rods with...

Page 11: ...ake the loop around the bar a few inches and secure it at the end with an anchor peg Holding the shaft inside the loom take the other end of the texsolv and loop it OVER the left side pulley of shaft...

Page 12: ...making a tight loop Fig 3 Grab the texsolv cord coming out of the computer as sist box for the shaft you are hanging and pull the cord through the holes in your texsolv loop Fig 2 3 2 Note the red col...

Page 13: ...ng is to make sure that the threads come through the reed at the correct point You will do this step once you have your first warp on the loom Once the loom is threaded and the reed is sleyed look at...

Page 14: ...pen A first tap will open the next shed and hold it open The next tap will close that shed and open the next shed Your foot only taps but does not hold the pedal Slow is operated with the only the rig...

Page 15: ...ready to weave click on Loom Control under the Weave menu The Loom Test The loom test is a diagnostic test that lets us know if the loom control box is working correctly Use it to check the loom when...

Page 16: ...in your draft the starting pick will be 1 and the end pick will be the last pick in your draft However sometimes you will have a treadling section that repeats and you can use these buttons to set the...

Page 17: ...g the Comports EW system looms older than 2016 1 Shut down computer and loom 2 Connect the serial cable to the computer and the loom box 3 Turn on the loom and the computer 4 See if the computer downl...

Page 18: ...to the control box The warp is too tight Cords often slip from the rollers The peg is too close to the roller The shaft only rises from the other end The cord from the neighboring shaft has jumped ove...

Page 19: ...ust inside the unit 3 Lubricating the slide bars The metal slide bars inside the box need to be lubricated every 6 months more often with heavy use Make sure power cord and computer cable are disconne...

Page 20: ...e loom box to us for repairs If it is necessary to send the loom box back to Webs we will supply packing in structions Costs of packing are not covered by the warranty After the first 60 days the purc...

Reviews: