background image

 

  W W W . T M G I N D U S T R I A L . C O M             P 2 2 / 3 1         T o l l   F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9 

Step 7 : Install mechanical roll up doors. 

 

 

D

oor curtain installation.

 

 

 

No. 

Part 

Qty 

 

No. 

Part 

Qty 

15 

 

5x2 

 

35 

 

1x2 

16 

 

5x2 

 

 

 

 

 
 

Summary of Contents for TMG-DT2030-PRO

Page 1: ...W W W T M G I N D U S T R I A L C O M P 0 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Page 2: ...ration Check all components and parts before installation All parts are marked with a part number please refer to the parts list to ensure you have all parts Choose a day with low or no wind to instal...

Page 3: ...W W W T M G I N D U S T R I A L C O M P 2 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Frame structure diagram...

Page 4: ...ar truss 1495 4 3 Shoulder tube for middle trusses 1444 6 3A Shoulder tube front and rear trusses 1444 4 4 Sidewall tube middle trusses 2163 5 4A Sidewall tube front and rear left truss 2163 2 4B Side...

Page 5: ...rear vertical door rail left side upper part 1465 2 9R Front and rear vertical door rail right side upper part 1465 2 9A Side door left tube 2027 1 9B Side door right tube 2027 1 9C Side door L2000xW9...

Page 6: ...nect 16 1859 10 17 Sidewall frame steel tension cables 3700 10 18 Ridge steel tension cables front and rear trusses 2800 16 19 Middle truss crossing steel tension cables 2000 3 20 Front and rear truss...

Page 7: ...grooves at both ends of 33 4000 7 27A Connector for connection 27 25 6 28 Self locking bolt and nuts M10x70 34 29 Strengthened bolt and nuts M12x30 100 30 Hex bolt and nuts M10x50 10 31 Hex bolt and n...

Page 8: ...W W W T M G I N D U S T R I A L C O M P 7 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Step 1 Baseplate positioning and installation No Part Qty No Part Qty 5L 2 6R 2 5R 2 7 6 6L 2 7B 48...

Page 9: ...W W W T M G I N D U S T R I A L C O M P 8 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Step 2 Assemble all trusses Front truss No Part Qty No Part Qty 1A 1 4A 1 2A 2 4C 1 3A 2 29 12...

Page 10: ...W W W T M G I N D U S T R I A L C O M P 9 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Second truss No Part Qty No Part Qty 1 1 4 1 2 2 4D 1 3 2 29 12...

Page 11: ...W W W T M G I N D U S T R I A L C O M P 1 0 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Rear truss No Part Qty No Part Qty 1A 1 4A 1 2A 2 4B 1 3A 2 29 12...

Page 12: ...W W W T M G I N D U S T R I A L C O M P 1 1 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 The rest of the trusses 2 trusses No Part Qty No Part Qty 1 1x2 4 2x2 2 2x2 29 12x2 3 2x2...

Page 13: ...7 7 6 1 2 8 1 9 Lay down all 5 trusses on the ground when the assembly is all completed and before moving to next step and then wrap 38 around the sharp points of the joint to avoid friction between t...

Page 14: ...afest way otherwise pull with ropes is another option but you have to make sure it is safe and you have enough manpower We recommend 4 to 6 people to pull the truss up from different directions When t...

Page 15: ...o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Step 4 Put up the rest trusses Refer to step 3 to put up the rest trusses connect all purlins 5 with bolt 28 and secure all bolts firmly on each span before going t...

Page 16: ...G I N D U S T R I A L C O M P 1 5 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Repeat above step to put up all other trusses from 3rd to 5th truss and connect all purlins No Part Qty No Part Qty 5 21 29...

Page 17: ...W W W T M G I N D U S T R I A L C O M P 1 6 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Install the side door frame No Part Qty No Part Qty 7B 4 11C 1 9A 1 31 6 9B 1...

Page 18: ...W W W T M G I N D U S T R I A L C O M P 1 7 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Install the side door No Part Qty 9C 1 37 8 Align the lock cylinder boss with the hole...

Page 19: ...I N D U S T R I A L C O M P 1 8 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Tension cable installation All cables are diagonally installed on each side of the interval No Part Qty No Part Qty 17 10 19 3...

Page 20: ...o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Step 5 Front and rear trusses to complete 2 trusses No Part Qty No Part Qty 8 1x2 20 2x2 9 1x2 23B 1x2 9L 1x2 23C 1x2 9R 1x2 24 2x2 10L 1x2 24A 2x2 10R 1x2 25 4x2...

Page 21: ...1 9 Step 6 Install front and rear cover panels Lift up 34 cover panels starting from the center point of the frame highest ridge point use ropes 32 through the grommets to tie the panel to the truss...

Page 22: ...W W W T M G I N D U S T R I A L C O M P 2 1 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Install the front and rear door pressing plate No Part Qty 22A 2x2 22B 2x2 37 24x2...

Page 23: ...W W W T M G I N D U S T R I A L C O M P 2 2 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Step 7 Install mechanical roll up doors Door curtain installation No Part Qty No Part Qty 15 5x2 35 1x2 16 5x2...

Page 24: ...3 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Front and rear door installation please look at the door from inside The hand winch 23 comes with a shorter cable we call it cable B No Part Qty No Part Qty...

Page 25: ...roof cover unpack the cover and position it parallel to the building frame on one side The cover must be pulled over the top of the truss frame without being snagged or stressed on any frame members U...

Page 26: ...S T R I A L C O M P 2 5 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 After the cover is installed on the roof insert the plastic pipe 27 slowly into the grooves on two ends of the cover not two sides No...

Page 27: ...M G I N D U S T R I A L C O M P 2 6 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Then insert tension tubes 14 14A 14B in the groove on both sides of the cover bottom No Part Qty No Part Qty 14 7 14B 1 14...

Page 28: ...W W W T M G I N D U S T R I A L C O M P 2 7 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Tension both ends of the cover with the tensioning device No Part Qty 7A 24 21 24...

Page 29: ...W W W T M G I N D U S T R I A L C O M P 2 8 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Tension both sides of the cover with the tension device No Part Qty 7A 11 21 11...

Page 30: ...W W W T M G I N D U S T R I A L C O M P 2 9 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Tie the rope...

Page 31: ...W W W T M G I N D U S T R I A L C O M P 3 0 3 1 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Complete side door installation No Part Qty No Part Qty 22A 2 32 1 22B 1 37 20...

Page 32: ...fabric cover must be removed as soon as possible If snow becomes solid ice on the cover it will increase the weight on the roof and collapses the building or reduce the life span eventually Keep the...

Reviews:

Related manuals for TMG-DT2030-PRO