W W W . T M G I N D U S T R I A L . C O M P 6 / 2 0 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
Step 2 : Assemble all trusses
The building includes 17 trusses : (1) Front truss (1st truss), (1) rear truss (17th
truss), and (15) middle trusses. The front and rear trusses are installed with the
fabric panel (#23).
Both front and rear truss include the following parts. Connect all tubes with bolt
(#18)(refer to figure 2).
- (1x2) Peak arch tube (#1)
- (2x2) Upper rafter tube (#2A)
- (2x2) Lower rafter tube ( #3A)
- (1x2) Ceiling cross bar (#11)
- (2x2) Hex bolt (#19)
- (8x2) Half round head bolt (#18)
Figure 2